Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 556 decisions within 5 km, 2 exact-site or onsite candidate records, and 27 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
27 structured nearby appeal records.
27 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
To erect 4 No. flagpoles; 1 No. 8.00m high and 3 No. 6.00m high along with ancillary site works
1) the alterations to existing site access at existing materials recovery facility, 2) associated and ancillary works
An increase in the amount of waste accepted annually from 24,750 tonnes to 30,000 tonnes. The proposed increase does not require the construction/provision of any new buildings/structures or any alteration to the current site layout, drainage and operations. The development will require a review of the Industrial Emissions Licence granted by the Environmental Protection Agency. An Environmental Impact Statement has been submitted with the planning application
The hardstanding area for agricultural use in an existing agricultural field, (approximate area of hardstanding area - 0.058 Hectares)
Modifications to the previously permitted elevations including changes to the new drive-thru bays, menu signs, and ordering station, new signage to all elevations, additional plant at roof level, new corral including chiller and freezer and a 10ft. container with associated internal building access and modifications within the grounds of the premises including kerb lines, pedestrian crossing, road markings, removeable bollards at the sites entrances, landscaping, boundary treatments, car parking including new grill bays and accessible parking, new bicycle parking, outdoor furniture/seating area, bin store, goal post height restrictor, signage, lighting and all other associated site works
The provision of 2 no. additional bedrooms and associated services at a proposed new first level to our existing dwelling house, a new 'A' roofed extension to the front of the dwelling, elevational and internal modifications, provision of dormer windows/rooflights, hard and soft landscaping, widened site entrance with new gates and piers and all ancillary site works
The brief summarizes the pattern across all 556 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19600208The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief