Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 107 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
No current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A) proposed new part 1.5 storey, part single storey dwelling, b) proposed new single storey garage, c) proposed new treatment system & percolation area, d) proposed new entrance from main road, and e) all associated site works and service connections
A cattle underpass, slatted effluent tank and all associated site works
Single storey dwelling house, domestic garage, septic tank, percolation area, entrance and ancillary site works
(a) a single storey detached dwelling, (b)1 no detached storage shed, (c) 1 no detached structure (Kennel), with all associated site works including septic tank/percolation area, borewell and site entrance
Construction of a slatted shed and all associated site works
The change of use of the existing Preschool/School Age Childcare facility to provide a full day care facility to also include a baby room, a toddler room and associated sleep rooms, proprietary treatment plant and raised bed percolation area. RETENTION PERMISSION is also required for the existing prefabricated unit 1 for a period of 5 years, preschool building 2, staff canteen prefabricated unit, existing carpark, open storage shed, bin storage unit, kitchen area, open roofed playground pergola and ancillary site works
The brief summarizes the pattern across all 107 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19600233The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief