Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 190 decisions within 5 km, 3 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construction of a dwellinghouse, wastewater treatment system, percolation area, extend existing driveway to use existing entrance and all ancillary site works. A Natura Impact Statement has being carried out on this site and a copy of same is submitted with the application
Construction of a new dwelling house, using existing entrance onto public roadway, new septic tank and percolation area and all associated ancillary siteworks
To (1) retain 2 no. extensions to front and side of dwelling house as constructed, (2)retain garage as constructed, (3) retain garden shed as constructed, (4) retain patio and pond area with glazed screen as constructed and full planning permission to upgrade existing waste water treatment system along with ancillary site works
1) Renovate and extend existing house to include granny flat. 2) Construct a garden shed to the rear of the property. 3) Upgrade waste water treatment system. 4) Upgrade existing entrance.
To renovate and extend existing cottage, construct a domestic storage shed, install a new waste water treatment system along with all ancillary site works
Vehicular entrance, dwelling house, septic tank & percolation area together with all associated site works
The brief summarizes the pattern across all 190 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19600249The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief