Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 157 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of new single-storey dwelling, alterations to existing farm entrance to form shared entrance, septic tank and filter system constructed on-site and soil polishing filter and associated site boundary and site development works
The construction of a 2-storey laboratory building with veterinary staff offices, storage rooms, plant room, bin store, 2no. overnight bedrooms for veterinary nurses, canteen and all ancillary site works
The construction of a steel framed and cladded horse barn with 8 stables and work area, together with all ancillary site works, on the grounds
New 16 stable steel framed & cladded barn and associated site works
For steel framed steel cladded stable building for seven horses, steel framed steel cladded hay barn structure, farm machinery compound/hard stand, new gateway and underground effluent storage tank and for permission for the erection of a dung stead and ancillary site works
A new two storey dwelling, septic tank with percolation area, new entrance and all associated site works
The brief summarizes the pattern across all 157 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19600260The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief