Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 141 decisions within 5 km, 2 exact-site or onsite candidate records, and 8 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
8 structured nearby appeal records.
8 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Erection of a portacabin for sessional use for childcare facilities including after school care from 7.30 a.m. to 9.10 a.m. (ages 4-12 yrs), preschool care from 9.20 a.m. to 12.20 p.m. (ages 2.5-5 yrs) and after school care from 2.00 p.m. to 6.00 p.m. (ages 4-12 yrs) Monday to Friday, connection to on-site wastewater treatment system and for all associated works
Construction of a 400m running track, perimeter walking track, long jump & external exercise area. Reconfiguration of existing soccer field, provision of pitch drainage, and two new dugouts. Construction of a precast hurling wall, training area & basketball court, enclosed by a 2.4 meter high weld-mesh fence and 2.6 meter netting on top. Flood lighting and associated site lighting, site boundary & site development works
Installation of a 200m3 reservoir, chlorine booster facility incorporating control kiosk, and inspection chambers on the existing Dualla water treatment plant site
The indefinite retention of as-constructed field entrance to their lands
Erection of a portacabin for sessional use for childcare facilities including before school care from 7.30 a.m. to 9.10 a.m. (ages 4-12 yrs), preschool care from 9.20 a.m. to 12.20 p.m. (ages 2.5-5 yrs) and after school care from 2.00 p.m. to 6.00 p.m. (ages 4-12 yrs) Monday to Friday, connect to public services and all associated works in the curtilage
(i) reorganise the existing entrances to the car park from 3 no. existing entrances to a single entrance and a single exit, (ii) install a new surface water infiltration system, (iii) resurface the existing carpark with new parking layout, (iv) erect new car park lighting - and all associated site works
The brief summarizes the pattern across all 141 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19600371The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief