Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 309 decisions within 5 km, 3 exact-site or onsite candidate records, and 18 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
18 structured nearby appeal records.
18 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construction of a detached garage to the rear of my property and replace the existing north, east and west boundaries with new block boundary walls and all associated site works
To retain Indefinitely extension to house and all associated works
1) the construction of 72 no. residential units comprising: a) 4 no. 2-bed houses, b) 40 no. 3-bed houses, c) 24 no. 4-bed houses, d) 2 no. 2-bed duplex units, e) 2 no. 1-bed duplex units; 2) the provision of a new pedestrian and vehicular access to Cregg Road (R697) and the provision of a shared access laneway; 3) the provision of all associated surface water and foul drainage services, provision of an attenuation tank and sustainable drainage solutions (SuDS), connections and sewer upgrade works and all associated site works and ancillary services; 4) the provision of communal open space, private open space, site landscaping and boundary treatments, public lighting, resident and visitor car parking, bicycle parking, pedestrian, cycle, and vehicular links throughout the development, and all other associated site development works
Demolition of existing entrance Hall/Study/Side Porch attached to our Residence and demolish Existing Detached Rear Garden Store and for to Construct Single Storey Extension to the Front (South) and Side (East) and Rear (North) with Alterations to our Detached Bungalow Residence and all associated Site Works
A single storey square bay window extension to front of dwelling along with all associated works
Construction of 36 no. dwelling units comprising of 4 one storey one bed units, 1 no one storey 2 bed unit, 2 no. one storey 3 bed units, 1 no. two storey 4 bed unit, 12 no. two storey 3 bed units and 16 no. two storey 2 bed units, 65 parking spaces, provision of attenuation area, general provision of the public open space, landscaping and associated site development works
The brief summarizes the pattern across all 309 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19600535The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief