Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 758 decisions within 5 km, 9 exact-site or onsite candidate records, and 57 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
57 structured nearby appeal records.
57 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Relocate existing mobile MRI scanner and erect a covered canopy to link access to main hospital building for a period of 10 years and for permanent permission for alteration of existing door opening to a glazed screen (Protected Structure Reg No 22116001)
A three storey extension to the hospital and temporary accommodation. The extension includes Emergency Department waiting area, triage rooms, offices, plant room and ancillary staff facilities. The proposed site is within the curtilage of a protected structure (ref: TRPS2209)
The development will consist of a single storey link corridor extension connecting first floor of existing CT/MRI building to adjacent car park area and ancillary related site works. The proposed development is within the curtilage of a Protected Structure
(i) the construction of a Single Storey Link Corridor between Slievenamon Unit and Main Hospital; (ii) the provision of roof mounted solar panels with safe guarding to Slievenamon Unit; (iii) alterations to layout of existing car parking to south of Slievenamon Unit, including demarcation of Age Friendly parking; (iv) alterations of existing and construction of new sections of campus road and footpaths; (v) ancillary services and associated site works to include landscaping, fencing, and street lighting. The proposed site is within the curtilage of a protected structure (RPS REF: 295)
(1) Demolish exisitng side garage and rear shed, (2) Construct new side and rear extension, (3) Re-orientate existing entrance and all associated site works
Erection of two no. single storey draught lobbies, one to front of existing hospital at main entrance and one to side of hospital at the emergency department entrance and associated site works all at STGH (St. Josephs Hospital - Protected Structure Reg. No. 22116001)
The brief summarizes the pattern across all 758 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19600598The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief