Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 154 decisions within 5 km, 8 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of an astroturf playing area with security fencing, floodlighting and ancillary works
Construction of new single storey extension to the north-east elevation and to the rear of existing primary school building, to accommodate 3 no. mainstream classrooms with ancillary accommodation including w.c.s and new boiler house. Ancillary works to include: minor elevational alterations to existing school building; removal from site of existing boiler house; removal of 1 no. existing temporary prefabricated unit; removal of 1 no. existing covered shelter and removal of existing oil tank and installation of new enclosed (1.8m high fencing) oil tank and all associated site works
Construction of new 5m high ball-alley wall on the north east corner of the site and all associated site works
Construction / installation of 1 No. single storey temporary prefabricated unit to accommodate a mainstream classroom with ancillary accommodation including wc's and all associated site works
For construction of; 1) a single storey extension to the southwest elevation of the existing primary school, to accommodate new ASD Unit comprising of 1 no. classroom, corridor, sensory room, para-educational room and ancillary school accommodation to serve same, 2) to construct new sensory garden to serve ASD Unit, to be enclosed by 2m high fencing with a side access gate on northeast side of the sensory garden and 3) to construct new single storey extension to the northwest elevation of existing school building to accommodate a disabled access W.C. including any modifications to existing structure to accommodate proposed works to widen existing vehicular school entrance and all associated site works
Development of 7 no. serviced sites together with all associated site development works to include entrance, roads, footpaths, underground services, connection to existing sewer and boundary treatments
The brief summarizes the pattern across all 154 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19600606The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief