Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 167 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(1) an existing domestic garage (2) an existing stable and agricultural building facility and (3) as constructed amendments to elevations of dwelling
Construction of (I) milking parlour with collecting/drafting yard and underground effluent tank (ii) extension to slatted shed with underground effluent tank (iii) two agricultural farm gates and all associated site works. Retention for (I) dung stead (ii) loose shed (iii) agricultural farm gate. Demolition of two loose sheds are also required
Cubicle shed with slatted tank and all associated site works
Construction of (i) overground slurry tower (ii) dungstead and all associated site works. Retention Permission for loose shed
1. The construction of a domestic extension to an existing dwelling. 2. The construction of a wastewater treatment system and percolation area. 3. Alterations, including enlarging, reducing closing up, opening up, of window and external door openings to the original dwelling and all associated site development works which is located in close proximity to a Zone of Archaeological Potential
A single storey dwelling house, domestic garage, new site entrance, septic tank/treatment system and percolation area, soak pit and all associated site works
The brief summarizes the pattern across all 167 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19600644The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief