Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 130 decisions within 5 km, 4 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
As constructed waste water treatment system on enlarged site to previously granted application PL 02/679, entrance as constructed and all related site works
A new dwelling house, garage, entrance, private well, driveway, treatment system and all associated site development works
For development to include retention of domestic garage to rear of property and retention of solar panels to south facing roof
A dwelling, garage, entrance, waste water treatment system and all associated site development works
Retention permission for the existing agricultural roadway and Permission to construct 2 no. two-storey dwellings with entrances, driveways, domestic garages, wastewater treatment systems, and all associated site development works
A dwelling, garage, entrance, waste water treatment system and all associated site development works - this development will be constructed on a phased basis, constructing and completing one phase at a time or both phases at the same time, proposed phases have been illustrated on the drawings and documents submitted with the planning application
The brief summarizes the pattern across all 130 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19600758The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief