Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 136 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a single-storey extension to rear & side of existing dwelling (ii) change attached garage to offices (iii) demolition of rear hall and utility (iv) minor internal alterations to existing dwelling and all with associated site works
To erect (I) Silage Slabs (ii) collecting yard/handling yard to be built over existing silage slab (iii) extension to existing cubicle shed & all associated site works
482m2 of photovoltaic panels on the roof of the existing building with all associated site works
Construction of (1) cubicle shed extension with underground tanks (2) calf shed extension with effluent tank and all associated works
A new single storey loading bay extension to the side of the existing single storey van loading bay building. The new extension will consist of six new van loading bays, new wall and roof panels to match existing, and all associated site works at their existing facility
Replacement of existing treatment systems with a combined packaged secondary treatment system discharging to packaged tertiary filters with underlying soil polishing filter and all other site works
The brief summarizes the pattern across all 136 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19600759The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief