Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 209 decisions within 5 km, 2 exact-site or onsite candidate records, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Dwellinghouse, domestic garage, septic tank, percolation area and all associated site works
On the grant of outline permission (Ref. No. 19/60/0791) for a development. The development consists of the construction of a dwelling house, domestic garage, septic tank, percolation area and all associated site works
A part two-storey dwelling house, detached garage, wastewater treatment system, site entrance and all ancillary site works
Dwelling house with attached domestic garage, wastewater treatment system, bored well, driveway, entrance and all associated site works
The upgrade of an existing entrance to accommodate a half-bellmouth forest entrance, construction of a forest road and ancillary works. The forest entrance will adjoin the public road and will facilitate occasional access of forestry vehicles
(1) a new farm building for the housing of livestock with a solid concrete floor and external concrete yard, all completed with associated siteworks; (2) Permission to construct a new farm building for the housing of livestock with a solid concrete floor, external concrete yard and perimeter walling, all completed with associated siteworks; (3) Retention permission for farm building, as constructed, for the housing of livestock, completed with associated siteworks; (4) Retention permission for farmyard manure storage pit, as constructed, completed with associated siteworks
The brief summarizes the pattern across all 209 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19600791The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief