Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 737 decisions within 5 km, 3 exact-site or onsite candidate records, and 56 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
56 structured nearby appeal records.
56 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a 24m high telecommunications support structure carrying antennas and transmission dishes, with associated equipment units and security fencing
The erection of new external signage on the Front Elevation (South Eastern side) of the existing Supermarket building
Increase of the roof pitch and ridge height of the existing single-storey side annex of dwelling to accommodate new bathroom at first-floor level, make modifications to existing dwelling and all associated site development works
An Electric Vehicle (EV) Charging Station, a site of ca. 0.017ha. The development will consist of 4 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 8 no. charging points. The charging bays will be located in the existing car park replacing 10 no. standard parking bays with 8 no. EV charging bays. It is proposed to erect an ancillary building to house an ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works
Change of use from retail to full off licence
The construction of a single storey extension to the rear and side of the existing building together with all associated site works
The brief summarizes the pattern across all 737 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19600816The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief