Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 111 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A) renovation of dwelling including internal alterations and elevational alterations b) single storey extension to rear of dwelling c) renovation of existing rear outbuilding and conversion to provide living space, including elevational alterations d) construct entrance gate to side of dwelling and to block up existing side entrance e) alterations to garden wall including insertion of access gate and door f) relocation of existing septic tank and pump chamber g) all associated site development works. The development consists of carrying out works to Recorded Protected Structures reference numbers S519 two storey house, S520 outbuilding and S521 single storey outbuilding
(A) the change of use of part site area to commercial shop storage, new entrances in rear boundary stone wall and associated concrete hardstanding. (B) site clearance and removal of rubble from collapsed structure. Planning permission for (A) a new boundary fence and gates of steel and timber construction, domestic garage / store of steel frame and cladding and associated hard standing area and all necessary services. This is within the curtilage of a protected structure ref S537
Extension and alterations to existing derelict house and associated site works
The erection of extensions and alterations to existing dwelling comprising of a single storey ground floor extension, a first floor extension over existing lean-to roofed single storey extension, skylights to existing attic roof storage space and all associated site works all to the rear of the dwelling
Change of use of existing commercial hairdressing and beauty treatment salon to domestic dwelling
Construction of lighting to the previously approved pedestrian walkway (granted under planning reference no. 2560604) and all associated site development works
The brief summarizes the pattern across all 111 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19600992The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief