Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 264 decisions within 5 km, 2 exact-site or onsite candidate records, and 14 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
14 structured nearby appeal records.
14 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construction of a single storey extension to the side of existing dwelling house
Construction of an extension to the side of our building to form a larger bathroom and utility and all associated site works
Construct 8 no. new dwellings including all associated site development works such as entrance, roadways, footpaths, new boundary treatments and connection to underground services as well as the closing up of an existing entrance to an existing neighbouring dwelling and opening a new entrance to the proposed estate roadway as well as providing a foul connection to the same existing dwelling and the decommissioning of the existing septic tank currently serving the existing dwelling
Construction of 6 no. two storey dwellings, new vehicular entrance onto public access road, connection to public services, carparking, roads, footpaths, pedestrian access, open space areas and ancillary site development works
The as constructed rear extension and storage shed, including all associated site development works
Installation of proposed pitch lighting and all associated site development works
The brief summarizes the pattern across all 264 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19601005The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief