Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 213 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A domestic garage to the rear of existing residential dwelling house together with all associated works
Erection of a prefabricated 100 m sq. ASD unit, alterations and extension of the existing car parking area, construction of play areas, fencing, connection to services and all associated works to a protected structure
A standalone disability toilet block and all associated site works, The works are within the curtilage of a protected structure
Re-locating the baptismal font to the Nave in front of the high altar, constructing a lobby, meeting room, store,and accessible wc facilities in the north-west transept, constructing an adoration chapel in the south-east transept, the removal of continuous benching along the side aisle external walls and provision of new radiator covers at the same location, re-configuring of the lobby to the sacristy to provide improved fire escape, renewal of electrical services to include lighting, public address, fire and smoke alarms, and renewal of mechanical services to include the heating system and water supply, and a new drainage connection to facilitate new wc’s. The Church of the Sacred Heart, Templemore is a protected structure TM S10, and on the National Inventory of Architectural Heritage, NIAH Reg No 22308048.
Of 6 number roof windows to the west elevation and 1 number roof window to the east elevation as constructed and for permission to insert 1 number fire escape roof window to the west elevation and all associated works to first floor residence
To demolish existing private balcony and to construct a first floor residential extension together with a new rear private balcony, a ground floor extension to the existing funeral home, to upgrade the existing waste water treatment system together with all associated site works
The brief summarizes the pattern across all 213 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19601044The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief