Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 141 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construction of an extension onto the side of our dwelling
The demolition of an existing dwelling and to erect a single-storey replacement dwelling. The works are summarized as – a) the demolition of existing two-storey dwelling b) the demolition of existing farm buildings c) the provision of a new vehicular entrance d) the decommissioning of an existing septic tank and site percolation area e) the provision of a new on-site sewage treatment plant and associated site percolation area f) the adjustment of site levels g) the construction of a new single-storey replacement dwelling with domestic garage and carport and to carry out all associated site development works.
Construction of a new part single storey, part one & half storey split level dwelling with car port to east side and packaged wastewater treatment system with sand polishing filter. New vehicular entrance to northern boundary & single storey portal frame shed to north east of site, & all associated site boundary & site development works
Construction of new storage shed with 235 square metres of pv panels on the roof of shed and carry out associated site works
The demolition of a single-storey porch to the front and demolition of chimney, demolition of shed to rear, alterations to elevations, external works and all necessary site services and site development works, erection of new porch, erection of rear single storey structure, alterations to front dormer windows to roof
Proposed dry storage shed
The brief summarizes the pattern across all 141 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19601055The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief