Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 735 decisions within 5 km, 7 exact-site or onsite candidate records, and 54 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
54 structured nearby appeal records.
54 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construction of a domestic garage to the side of existing dwelling house with dropped kerb to existing public footpath, separate access and access drive, all associated site works
As constructed rear extension, timber shed and playhouse including all associated site development works
To alter the layout and proposed house types on part of the site and to incorporate the total number of houses from 72 to 74, existing planning permission ref. no. 05/43. The proposed changes are to the Cul-de-Sac at the southern end of the site and will include the following: omit 9 No. Houses Nos. 53 - 60 inclusive and No. 72 (4 No. 3 bedroom single storey houses Type 53b) and 5 no. 4 bedroom dromer type house Type 54Dr/54DRH) Re Number Houses Nos. 61-71 inclusive as Nos 62-72, Add back 11 No. Houses to be numbered 53 - 61 inclusive and Nos. 73-74 (4 No 2 storey Semi Detached 3 Bedroom House Type 3TA1 / 3TA1H) 5 No. 2 storey detached 4 bedroom house type 54C1 / 54C1H, 2 no. 2 storey detached 5 bedroom House Type 55C1/55C1H) Changes to external works and to site development works will also be included under clause B 42 (1A)(a)(V)
Completion of infrastructural work commenced under previous Permissions Nos. 05/43 and 07/107 and to construct 22 no. two-storey houses complete with external works and site development works, on their site. The development will include 10 no. detached 4-bedroom houses; 8 no. semi-detached 4-bedroom houses and 4 no. semi-detached 3-bedroom houses and will represent completion of the final phase of Gort na Manach
To convert and extend the existing garage to living accommodation and to provide a 2 no bedroom extension over converted garage
Domestic shed and pergola at the rear of property
The brief summarizes the pattern across all 735 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19601066The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief