Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 427 decisions within 5 km, 2 exact-site or onsite candidate records, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Installation of single storey temporary accommodation building comprising 2 classroom ASD unit, 4 classrooms, 5 office/tuition rooms, toilets, car parking and all associated site works, along with the retention of an existing single storey temporary accommodation building comprising 1 classroom
6 relocated car-parking spaces, extension to internal access road with all ancillary site works necessary to facilitate the proposed development
Modifications to the unmanned service station permitted under Tipperary County Council Ref. No. 23/60405 consisting of the provision of 1 no. additional fuel pump, a revised forecourt canopy, a new underground fuel storage tank, and all associated site development works
(1) the demolition/removal of existing structures including 1 no. storage container, gates, signage, dispensing pumps, gantry and bottom loading skid on site; (2) the change of use of an existing warehouse (unit 1) to office space and the change of use of an existing office building (unit 2) to provide ancillary storage space; (3) elevational changes to the existing warehouse (unit 1); 4) the construction of an unmanned fuel service station consisting of a) 2 no. fuel pumps with canopy over, dispensing fuel on each side and b) the erection of 1 no. totem sign; and 5) all associated ancillary development works including vehicular access, the closure of 1 no. existing entrance), boundary treatments, landscaping, drainage, plant and services area, and vehicular and bicycle parking
The erection of 10 no. track lighting poles
Redevelopment works at the Kinane Stand. The proposed works include (i) modifications to ground floor comprising removal of identified turnstiles and provision of new exit gate and construction of three service cores providing access to upper floor levels, to include wheelchair accessible turnstiles and separate ground floor store (ii) the insertion of a new first floor level under the existing stand to provide for gym, physio, changing room, media, function space and bar, kitchen, reception, meeting room, plant, store and associated circulation areas; (iii) reconfiguration of seating area to provide dedicated VIP and disabled access areas; (iv) provision of plant, maintenance and fire escape access at roof level; (v) all associated site works, including elevational changes, associated signage, landscaping and services infrastructure
The brief summarizes the pattern across all 427 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19601174The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief