Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
1% of nearby decided applications were refused. The site check found 158 decisions within 5 km, 9 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Inshore lifeboat station comprising portcabin and 2 storage containers for a period of 5 years, These facilities were previously permitted on a temporary basis under planning permission reference 04510250
Improvements to the boat mooring facilities at the western shoreline of the north jetty at the applicant's landholding to include a) removal of existing timber edge decking, localised re-alignment of the shoreline on the south-western section of the north jetty with new c. 2 m wide walkway/pier edge constructed on a line of a new stone filled galvanised steel mesh gabions topped with sustainable hardwood jetty edging and bitmac path onshore, b) proprietary "Versa-Dock" part floating docking system for mooring an RNLI rescue rigid inflatable boat (RIB) to facilitate rapid launching in emergencies and safe mooring of the RIB, c) low bollard type (c. 1.4 m high) safety lighting, d) underground services - electrical supplies, cables, hubs, water supplies from the existing LDYC water services system, e) domestic effluent pump-out station for sailing and motor boats (mainly cruisers) with receiving/pumping station to connect to existing foul effluent sewerage system at the Club, associated drainage and site works, f) landscaping enhancements - selection of indigenous tree species to provide wind protection to the moorings and to provide screening from the lake
Improvements to the boat mooring facilities at the western shoreline of the north jetty at the applicant's landholding to include a) removal of existing timber edge decking, localised re-alignment of the shoreline on the south-western section of the north jetty with new c. 2 m wide walkway/pier edge constructed on a line of a new stone filled galvanised steel mesh gabions topped with sustainable hardwood jetty edging and bitmac path onshore, b) proprietary "Versa-Dock" part floating docking system for mooring an RNLI rescue rigid inflatable boat (RIB) to facilitate rapid launching in emergencies and safe mooring of the RIB, c) low bollard type (c. 1.4 m high) safety lighting, d) underground services - electrical supplies, cables, hubs, water supplies from the existing LDYC water services system, e) domestic effluent pump-out station for sailing and motor boats (mainly cruisers) with receiving/pumping station to connect to existing foul effluent sewerage system at the Club, associated drainage and site works, f) landscaping enhancements - selection of indigenous tree species to provide wind protection to the moorings and to provide screening from the lake
Provision of demountable jib crane with capacity 2 ton SWL (Safe Working Load) which will be located adjacent to the slipway in existing private members harbour - use will be to 1. increase safety during lift in and out of members boats, 2. provide for servicing of masts and rigging, 3. facilitate launching and retrieval of visiting boats during racing events
10 individual single story bathroom extensions to the rear of existing two story cottages and all associated site development works
Minor modifications to the granted planning permission (Ref. No. 2360651). The modifications will consist of the following: a) mixed-use building: additional, below-ground back-of-house and plant space at the lower ground floor level. Additional plant space within the roof areas, including screening. Minor internal space modifications and adjustments at upper ground floor level, resulting in ca 43sqm of additional area. Minor modifications to elevations, reflecting layout changes; b) terrace units: internal layout modifications allowing for subdivisions and interconnection of bedrooms, resulting in the potential to provide 3 additional bedrooms, with an area increase of approximately 10sqm. Minor modifications to elevations, reflecting layout changes; c) apartment units: internal layout amendments to a block of type 1 apartment units, allowing for subdivisions and interconnection of bedrooms, resulting in the potential to provide 4 additional bedrooms, with minor modifications to elevation windows, reflecting layout changes. Internal layout amendments to a block of type 2 apartment units, allowing for subdivisions and interconnection of bedrooms, resulting in the potential to provide 3 additional bedrooms, with minor modifications to elevation windows, reflecting layout changes; d) existing waterside cottages: 6no additional single-story extensions to houses no. 5, 6, 8, 9, 10 and 11, accommodating en-suite bathrooms; e) all associated site development works
The brief summarizes the pattern across all 158 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19601201The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief