Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 743 decisions within 5 km, 3 exact-site or onsite candidate records, and 57 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
57 structured nearby appeal records.
57 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Sub-division of existing dwelling into two separate residences and all associated site boundary and site development works. Retention Permission for alterations to existing elevations
Changes to planning application Ref No. 19601306 to comprise of alterations to approved site boundary and site development works and construction of new vehicular entrance onto proposed access roadway (as granted under Strategic Housing Development Ref. No. ABP-320189-24) in lieu of approved shared entrance
Altering, reposition and widen the entrance to their property. The works will include demolition of parts of the existing and construction of new stone masonry wals, piers and gates complete with associated works
Amendments to the Strategic Housing Development (SHD) permitted on site under Ref. ABP-311290-21 for 115 no. residential units(47 no. apartments/duplexes within 5 no. 3 storey blocks and 68 no. 2-4 bed houses), creche and associated works. This amendment application seeks to omit all permitted duplex units (24 no.) and replace with a mix of additional houses (8 no.) and apartments (23 no.) along with a revised mix of units, resulting in a revised residential development of 122 no. units (7 no. additional units) and comprising: - 46 no. apartments (8 no. 1-bed & 38 no. 2-bed) within 3 no. 3 storey blocks - 76 no. two-three storey houses (9 no. 2-bed terraced houses, 37 no. 3-bed terraced houses, 10 no. 3-bed semi-detached houses & 20 no. 4-bed semi-detached houses). This amendment also includes a revised childcare facility of c.160 sq.m, and revised car and cycle parking provision (resulting in a revised overall total of 205 no. car parking spaces and 389 no. cycle parking spaces to serve the entire development). Vehicular and pedestrian access to be provided from Coleville Road (R680) as per the parent permission. All other site works including boundary treatments, landscaping and site services to facilitate development. The remainder of the development to be carried out in accordance with the parent permission Ref. ABP-311290-21. An updated Natura Impact Statement has been prepared in respect of the proposed development.
Construction of a structure to house biomass boiler system, a woodchip fuel store and all associated site development works. Hotel Minella is a Protected Structure
Installation of approximately 438m2 (74kW) of solar PV panels on the hotel's roof
The brief summarizes the pattern across all 743 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19601306The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief