Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 168 decisions within 5 km, 1 exact-site or onsite candidate record, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of 1) a new split level dwelling 2) new domestic garage 3) new site entrance, driveway and modification to hedgerow 4) waste water treatment system and all associated site works
Construction of an extension to our existing building and including all associated site development works
The replacement of approximately 184m of existing 2.4m high chainlink fencing and associated gates with 184m of new 2.4m high green palisade security fencing/gates and all associated site works at an existing Above Ground Natural Gas Installation located
Construction of (I) cubicle shed with underground effluent tank & feeding aprons, (II) Silage pit extension, (III) Calf shed and all associated site works. Demolition of open tank also required
Construction of (I) cubicle shed with underground effluent tank & feeding aprons, (II) Silage pit extension, (III) Calf shed and all associated site works. Demolition of open tank also required
Demolition of existing single-storey dwelling and garage and construction of a new one and a half storey, part single-storey dwelling, with separate garage, photovoltaic solar panels, packaged wastewater treatment system and polishing filter, vehicular entrance and associated site boundary and site development works
The brief summarizes the pattern across all 168 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19601314The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief