Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 307 decisions within 5 km, 2 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(1) Attic conversion (2) revised location of dwelling & domestic garage (3) site boundaries and Permission to extend dwelling and all associated site works
(a) removal of existing mobile home, decomissioning of existing septic tank, construction of a new dwelling, installation of a new waste water treatment unit with percolation area and all associated external site works and (b) PERMISSION for RETENTION of existing domestic garage, mobile home and existing site entrance with PERMISSION for the widening of said entrance
Construction of a new dwelling house, new sewage treatment system and percolation area, bored well and site entrance and ancillary site works
New single storey dwelling house with access road, septic tank, percolation area and all associated site works
Single storey dwelling house with attached domestic garage, site entrance, septic tank, percolation area and all associated site works
1) the demolition of the existing 2 no. domestic sheds; 2) the renovation and extension to existing dwelling house; 3) the installation of a new septic tank and percolation area; 4) the construction of a new domestic garage; 5) and all associated site works
The brief summarizes the pattern across all 307 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 19601318The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief