Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 215 decisions within 5 km, 2 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Amending the design of the previously approved development (Planning Reference: 19601323, Tipperary County Council) which comprises consent for a 10 year period to construct and a 40 year period to operate a 29.09 hectare Solar PV Energy Development at Derrymore Townland, Roscrea, Co Tipperary. The proposed amendments include; (1) changes to the configuration of the Solar PV rows, (2) reduction in the height of the Solar PV panels, (3) slight increase in the bottom height of the Solar PV panels, (4) reduction in the spacing of Solar PV rows (strings), (5) increase in size of solar panels, (6) increase in solar panel output, (7) a change in solar panels tilt (degree) and (8) a decrease in the number of solar panels. A Natura Impact Statement will also be submitted to the Planning Authority for this proposed development
The erection of a 29.09 Hectare Solar PV Farm. The proposed solar farm will consist of the installation of a 40 year operation and subsequent decommissioning of a series of ground mounted solar photovoltaic PV Panels, mounted on steel support structures 2.885m in height, together with a single storey ESB Control Room, connection to nearby ESB Substation, 9 electrical transformation enclosures, underground cabling, CCTV poles and cameras, deer type security fencing around the site boundary, Site Entrance access roads, Temporary Construction Compound Area, Landscaping and other associated development works, for the purpose of generating renewable energy electricity
New bungalow style dwelling house, domestic garage, septic tank and percolation area, new site entrance and all associated site works
Existing side extension to dwelling
Extension to sides of existing house and all associated site works
Dwellinghouse, new entrance, septic tank with standard percolation area and all associated site works
The brief summarizes the pattern across all 215 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19601323The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief