Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 139 decisions within 5 km, 2 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Alterations made to the footprint of the dwelling granted under Planning Ref No. 19/601437 and for Permission for change of garage type from that granted under Planning Ref No. 19/601437 and for Permission to further alter the partly constructed dwelling by the addition of an increased floor area to kitchen area along with all ancillary site works
A dwelling, garage, effluent treatment system, entrance and all associated site works
To construct entrance, dwelling house, domestic garage, septic tank, percolation area and associated site works
For the change of house type under previously permitted governing planning permission reference 2286 together with all associated site works
Development will consist of a 10 year permission for the construction of an energy storage facility within a total site of up to 0.86 hA, to include one single storey electrical substation building and electrical compound, electrical transformer/inverter station modules, containerised battery storage modules and spare parts containers on concrete support structures, access tracks, associated electrical ducting, cable racking and cabling, security fencing and CCTV security monitoring system, lightning protection poles, communications equipment and ancillary infrastructure
The construction of an energy storage facility within a total site of up to 0.86 hA, to include one single storey electrical substation building and electrical compound, electrical transformer/inverter station modules, containerised battery storage modules and spare parts containers on concrete support structures, access tracks, associated electrical ducting, cable racking and cabling, security fencing and CCTV security monitoring system, lightning protection poles, communications equipment and ancillary infrastructure previous ref 18600406
The brief summarizes the pattern across all 139 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 19601437The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief