Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 203 decisions within 5 km, 3 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construction of a dwelling, garage, site entrance, install on-site effluent treatment system including all associated site development works
The change of house type from that previously granted planning permission under Planning Reference No. 201229. The proposed house will be a single storey detached dwelling house
Amendments to condition 4 of Planning Permission 16/1014 namely the retention of existing site entrance as constructed but subject to amendments including all associated site works
(a) to raise the height of the roof over existing dwelling house, construction of a new two storey extension to the rear & front of house, provision of a first floor extension to the side of dwelling over existing extension, elevational changes and the provision of a new waste water treatment unit & polishing filter together with all ancillary site works and (b) Retention Permission is sought for existing extension to side of house
The demolition of existing dwelling house and for the construction of a replacement dwelling house, proprietary waste water treatment system and percolation area, entrance walls, garage and all ancillary site works
The construction of an entrance, dwelling house, garage, septic tank & percolation area together with all associated site works
The brief summarizes the pattern across all 203 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201229The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief