Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 1,051 decisions within 5 km, 1 exact-site or onsite candidate record, and 94 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
94 structured nearby appeal records.
94 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
The construction of a single storey bungalow, domestic garage, recessed entrance, secondary effluent treatment system and all associated site works,
(a) Retention permission for change of use of existing farm building to office use with canteen and WC. (b) Planning permission for new recessed vehicular entrance. Existing entrance to be closed up. (c) Planning permission for new 630sqm shed for agricultural use. (d) Planning permission for new proprietary wastewater treatment system and sand filter percolation area. (e) Planning permission for new surface water management works. Revised by Significant Further Information which consists of submission of a Natura Impact Statement
Construction of a two storey detached type house, one and a half storey detached type domestic garage with loft store, effluent treatment system, and all ancillary siteworks
For the construction of a solar PV development and an ‘under the fence’ transformer compound on a ca. 180ha site consisting of: I. Solar PV panels laid out in arrays across the Site; II. 39 No. inverter units (ca. 2.9m (h) x ca. 6.1m (l) and 2.4(w)); III. 1 No. control room structure (5m (h) x 15.3m (l) and 3.7m (w)); IV. 1 No. transformer unit (ca. 6m x ca. 4m) and associated bund; V. Security fencing around the ‘under the fence’ transformer compound (2.65m high); VI. Electrical and communications cabling; VII. Pole-mounted security cameras; VIII. Perimeter security fencing (2m high) and security gates; IX. Upgrade of 3 No. existing Site entrances; X. Development of 2 No. new Site entrances; XI. 3 No. temporary construction compounds; XII. Internal access tracks; and, XIII All associated ancillary development, landscaping and reinstatement works
For construction of a new 220 kV Gas Insulated Switchgear (GIS) building (83.5m long x 18.5m wide (25.1m including staircases), 17m in height) (1,637 sqm); construction of a new 110kV GIS building (68.8m long x 15.4m wide (22m including staircases), 15m in height) (1,138 sqm); both of the GIS Buildings will have 8 no. associated lightning protection spikes / rods on each of the roofs (3m in height); construction of 4 no. 220/110kV power transformers to include connections to the new GIS buildings; 2 no. 220kV and 1 no. 110kV line/cable interface towers and associated removal of 3 no. existing end masts and overhead line and cable works; 3 no. lightning masts (height 22m); cable connections to the 220kV GIS and 110kV buildings; new 4.5m wide internal access road and 10 no. new permanent car parking spaces; associated site excavation, infrastructural and site development works, and above and below ground boundary treatment and landscaping including palisade fencing (2.6m height), lighting and surface water drainage and foul water tank; associated demolition of existing bungalow farmhouse and agricultural buildings (1,112sqm floorspace total) to facilitate the proposed development; and all ancillary and associated temporary works to facilitate the development at the construction stage, including construction access track, temporary construction compound / site laydown areas and cable connection for the existing Derryiron-Maynooth 110kV overhead line. Planning permission is sought for a period of 10 years. A Natura Impact Statement will be submitted to the Planning Authority with the application
Increasing the number of children catered for from 10 to 14 in line with Early Childhood Ireland ECCE Scheme
The brief summarizes the pattern across all 1,051 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 201243The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief