Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 313 decisions within 5 km, 3 exact-site or onsite candidate records, and 37 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
37 structured nearby appeal records.
37 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCT A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, FRONT BOUNDARY ENTRANCE WALLS, INSTALLATION OF MECHANICAL AERATION UNIT AND FILTER SYSTEM WITH ALL ASSOCIATED SITE WORKS
(A) CONSTRUCT A SPLIT LEVEL BUNGALOW WITH ATTIC ACCOMMODATION (B) CONSTRUCT SHEDS TO THE SIDE OF THE DWELLING (C) INSTALL A MECHANICAL WASTE WATER TREATMENT SYSTEM FOLLOWED BY A POLISHING FILTER (D) CARRYING OUT MINOR IMPROVEMENT WORKS TO THE JUNCTION OF THE PRVATE ACCESS ROAD WITH THE PUBLIC ROAD AND (E) ALL ANCILLARY SITE WORKS
Permission for development to construct a farm shed for the storage of farm machinery including all necessary site works.
Full planning permission to ( a ) demolish existing farm building and ( b ) construct a dwelling house served by a septic tank & percolation area with all associated ancillary services / site works
TO CONSTRUCT A DWELLING HOUSE SERVED BY A SEPTIC TANK AND PERCOLATION AREA WITH ALL ASSOCIATED ANCILLARY SERVICES/ SITE WORKS
RETAIN (1) AS CONSTRUCTED DWELLING HOUSE, DETACHED GARAGE AND GARDEN SHED WITH A PROPRIETARY WASTE WATER TREATMENT UNIT AND POLISHING FILTER (2) ALL BUILDINGS WITHIN REVISED SITE BOUNDARIES
The brief summarizes the pattern across all 313 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 201283The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief