Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 542 decisions within 5 km, 3 exact-site or onsite candidate records, and 26 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
26 structured nearby appeal records.
26 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Refurbishment of existing childrens' tennis courts, consisting of a) re-surfacing b) alteration of fencing c) erection of floodlighting and d) construction of open sided viewing shelter, along with all ancillary site works
The construction of a 30m high telecommunications lattice support structure carrying antennas and transmission dishes, with associated equipment units, security fencing and access track
A) the first floor vacant (shell and core) unit to be used as a gymnasium and padel courts, b) the change of use of existing first floor play centre to gymnasium and padel courts, c) the change of use of existing 2nd floor play centre offices to gymnasium ancillary storage/plant room, d) minor elevational changes, e) the proposed signage, connecting to all existing services
Change of use to ground floor retail unit (Unit 7) from the permitted convenience retail foodstore (authorised under planning reference no. 18/600784) to provide for; (i) bulky good retail warehouse use with ancillary comparison sales space, dispensary and consult room; (ii) modifications to the elevations of Unit 7 to facilitate signage and advertising, and (iii) all associated site development works
(1) change of use to ground floor retail unit (Unit 7) from the permitted bowling alley use, to provide for a convenience retail foodstore with associated signage and roof mounted fixed plant and modification to the front elevation; (2) townscape enhancement works to include; the partial removal of the existing boundary wall and implementation of a programme of hard & soft landscaping along the Limerick Road site boundary, and all associated site development works
(a) construction of a new single storey standalone coffee kiosk (172m2) with external signage, and (b) modifications to the existing surface car park to facilitate the new building including new landscaping and walkways all
The brief summarizes the pattern across all 542 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 201339The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief