Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 243 decisions within 5 km, 2 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development will consist of the construction of an 18 metre high free standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network
To construct a single storey annex extension (Specific for Accessible Housing) to existing 2 storey dwelling house, the addition of 1 on site car-parking space and all associated site works
45 no. two-storey houses in the following typologies: 5 no. detached houses (1 no. four bedroom and 4 no. three bedrooms), 10 no. semi-detached houses (all three bedroom), and 30 no. terraced town houses (18 no. three bedrooms and 12 no. 2 bedrooms). the proposed development will also consist of provision of a new vehicular entrance off Mitchelstown Road, landscaped private and public open space, ESB sub station, new boundary treatments, 96 parking spaces, scheme lighting, site drainage works and all ancillary site development works above and below ground. The application will be accompanied by a Natura Impact Statement
(i) to increase the height of the existing roof and install 2 no. dormer roof windows & (ii) to enlarge the existing windows and front door to the existing dwelling and all associated site works
Increase the height of the existing roofs and install 2 no. dormer roof windows on each of the 3 houses
The extension, modification & renovation of existing dwelling and all associated site works
The brief summarizes the pattern across all 243 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201536The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief