Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 383 decisions within 5 km, 3 exact-site or onsite candidate records, and 34 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
34 structured nearby appeal records.
34 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the existing structural frame, floor slab, rising walls and foundations. PLANNING PERMISSION to complete the construction of Unit 3 Kilcullen Business Park as granted under Lapsing Planning Permission 02/1195 and 09/472. Along with all associated site development and facilitation works
The erection of a light industrial building containing workshop facilities, staff canteen, ancillary office and W.C. accommodation; enclosed rear yard with gate access from the south-east; illuminated signage to the north-west elevation and all associated site and landscaping works
For a single storey Cardiac Physiotherapy Clinic building, and the provision of all other associated site excavation, infrastructural and site development works above and below ground including ancillary bicycle and car parking, refuse storage area, lighting, new pedestrian access with accessible ramp, footpaths, landscaping and boundary treatments all at
Amendments to the regional distribution warehouse/logistics centre permitted under Ref.: 2422. (A) Alterations to the internal layout, including a reduction in the gross floor area from 3238sq.m to 2583sq.m. (B) Alterations to include the changes to the proposed main building to include first storey ancillary offices, staff facilities and drivers waiting area located on the first floor and (C) Alterations to internal layout to include change of use of warehouse space to truck maintenance area with 3no. service areas to the ground floor of the building envelope. (D) Alterations ancillary to the main building to include a 5.6m high truck wash. The development includes minor alterations to soft and hard landscaping, and permitted car parking layout along with all associated site development works
For construction of a regional distribution warehouse/logistics centre. The proposed main building will have a gross floor area of 3238 sq.m and will have an overall height of 12.8m (from finished floor level to parapet level) with two storey ancillary offices, staff facilities and drivers waiting area located within the main building envelope along with 6 no. loading docks and a level access loading bay located in the warehouse area, internal plant within warehouse, ground level air conditioning units, roof and southern elevation mounted solar panels and back lit elevation signage. Ancillary to the main building a new 6.5m high sprinkler supply storage tank ancillary 3.5m high pumphouse for fire safety is proposed. The proposed development involves the reconfiguration of an existing turning bay with ancillary roadside verge works and road markings, extension of the existing foul sewer and water main public infrastructure, onsite car parking spaces (including disabled spaces and EV spaces) on site cycle parking spaces. The development includes site development and facilitation works including new vehicular entrance, internal drainage infrastructure with connection to existing surface water pipeline, waste and recycling areas, boundary treatments, landscaping, service yards, internal roads, footpaths, lighting, internal gates and fire tender access route
(a) Removal of existing side boundary wall; (b) Alteration to position of existing side boundary; (c) Construction of new side boundary wall; (d) Widening of existing entrance along with all associated site development and facilitating works
The brief summarizes the pattern across all 383 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 201576The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief