Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,944 decisions within 5 km, 5 exact-site or onsite candidate records, and 171 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
171 structured nearby appeal records.
171 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a vehicle service area 279.225sqm, to include customer waiting facilities, site fencing & signage, an ancillary space for the adjacent commercial gymnasium 92.225sqm and all associated site works
The construction of a new two-storey dwelling(209 sq.m.) together with a new entrance, sewage treatment system and ancillary site works
The construction of a single storey car showroom and for 2 no. external car display areas with covered canopies, car parking, site lighting, building signage, 1 no. totem sign, connect to existing wastewater network, all with associated site development works
Extension of permission for planning ref. 16/1: the demolition of 95sqm. of unoccupied floor space and the demolition of entrance structures and canopies; the change of use of unoccupied floor space (7,328sqm.) (in addition to part of the existing car park) from retail and related used to education and training use with related ancillary enterprise and innovation uses and ancillary café use (140sqm.). The development will also consist of the following: additional floor space at ground level (100sqm.) and at first floor level, within the existing building envelope (2,751sqm.) for education and training use with related ancillary enterprise and innovation uses; bike storage areas (58sqm.); storage area (44sqm.); elevational amendments, including new opes and signage; revised internal layouts; alterations to existing roof profile (without increasing the maximum height of the building); provision of roof plant; new service yard to the south; bus shelter; all hard and soft landscaping; revisions to existing car park; external lighting; boundary treatments; changes to levels; and all associated development above and below ground. The gross floor space of the new educational facility (including ancillary café use and external storage areas) will be 10,281sqm.
A high-power electric vehicle charging hub & associated infrastructure, consisting of the following: i) installation of 4no. electric vehicle bays, (ZEVI compliant) & 4no. charging points (powered by 100% renewable energy), (ii) new modular ESB substation & (iii) landscape renewal
Development at a c. 0.0099ha site in the car park of Tesco Coonagh Cross, Clondrinagh, Clonconane, Ennis Road, Limerick. The development will consist of the construction of a sheltered canopy(c.55sqm) in the existing car park for the purpose of providing 2 no. dedicated "Click and Collect" spaces for the existing store and ancillary signage and all associated site development works
The brief summarizes the pattern across all 1,944 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20770The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief