Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 134 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a dwelling house with garage, artisan forge, two dog kennels, dog run, entrance, septic tank, percolation area and all associated site works and services
For a single-storey two-bedroom dwelling house, a site entrance, a new packaged wastewater treatment system and polishing filter, a bored well and all associated site works
For construction of a dormer type dwelling with single garage, packaged wastewater treatment system, sand polish filter with attenuation pad and all associated site works
To construct a dormer dwelling, detached domestic garage, new entrance, wastewater treatment system and percolation area, connection to group water scheme together with all other associated site works.
To construct a dormer dwelling, detached domestic garage, new entrance, wastewater treatment system and percolation area, connection to group water scheme together with all other associated site works
To construct a building consisting of a meeting room on the ground floor and a gym on the first floor including associated site works
The brief summarizes the pattern across all 134 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 20804The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief