Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 39 decisions within 5 km, 2 exact-site or onsite candidate records, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
Historic extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The RETENTION of an existing lattice type meteorological mast, 80m in height and associated instruments the nature of proposed use of the structure is to measure local climatic conditions. Permission is sought for a period of 12 months. RETENTION of the meteorological mast for an additional 12 months to facilitate the collection of a sufficient duration of meteorological data to inform a wind resource assessment for the site. The mast was erected on site as exempted development pursuant to Class 20(A), Part 1, Schedule 2 of the Planning & Development Regulations 2001 (as amended)
To construct a Bungalow, Entrance, Wastewater Treatment System and Ancillary Works
A two-storey extension to existing dwelling house. Also Planning Permission to construct a new single-storey extension and alterations to existing dwelling, and Planning Permission for new septic tank and percolation area and all ancillary services
Construct a single storey extension to the side and all ancillary site works
To construct a single storey extension to the side of dwelling and all ancillary site works
Construct two vehicular entrances to facilitate forestry work access
The brief summarizes the pattern across all 39 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211029The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief