To build a new dwelling house, install a Waste treatment System and all associated site and ancillary works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Carrownaclogh , Ennistymon , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
10% of nearby decided applications were refused. The preview found 281 nearby planning records within 5 km where a location match is available.
- Matched source
- 211079
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
To: (a) Demolish existing farm buildings, (b) Renovate and extend existing dwelling house with all associated site works
To build a new dwelling, install a waste water treatment system & all other associated site and ancillary works
Of the storage shed and the extension to side and rear of the dwelling house and all other associated site and ancillary works
To demolish and replace a substandard dwelling. This permission consists of the demolition of an existing substandard dwelling and the construction of a dwelling house, garage, proprietary treatment system and associated site works
For development at this site of a private dwelling house, polytunnel dome, refurbishment of the existing access lane with widened entrance and all necessaries utilities and services connections. The existing dwelling shall be retained and incorporated in the new dwelling house
The brief summarizes the pattern across all 281 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 211079The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief