Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 38 decisions within 5 km, 3 exact-site or onsite candidate records, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCT A NEW DWELLING HOUSE, DETACHED GARAGE, INSTALL A MECHANICAL TREATMENT UNIT AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
CONSTRUCT A NEW DWELLING HOUSE, DETACHED GARAGE, INSTALL A MECHANICAL TREATMENT UNIT AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
CONSTRUCT A SINGLE STOREY DWELLING HOUSE, FRONT BOUNDARY ENTRANCE WALLS, MECHANICAL AERATION UNIT AND SOIL POLISHING FILTER SYSTEM WITH ALL ASSOCIATED SITE WORKS
(1) PERMISSION TO RETAIN (A) TWO NUMBER ROOFLIGHTS TO REAR OF DWELING (B) STONE FINISH TO PART OF FRONT FACADE OF DWELLING (C) ENTRANCE AND FRONT BOUNDARY BLOCK WALL AND (D) POSITION OF ENTRANCE TO SITE (2) PLANNING PERMISSION FOR (A) ONE NUMBER ROOFLIGHT TO FRONT OF EXISTING DWELLING (B) ERECTION OF CONSERVATORY TO SIDE OF DWELILNG (C) DEMOLITION OF CHIMNEY TO FRONT OF DWELLING AND (D) ASSOCIATED SITE WORKS AND SERVICES
Retention permission to retain existing caravan on site
CONSTRUCT A BATTERY STORAGE COMPOUND ADJACENT TO THE EXISTING SUBSTATION WITH UP TO 10 NO. CONTAINER UNITS, PALISADE FENCING, SITE ACCESS TRACK AND ENTRANCE, BUNDED CONCRETE PLINTHS. ASSOCIATED ELECTRICAL EQUIPMENT, TRANSFORMERS, CONTROL BUILDING AND ALL ANCILLARY SITE WORKS
The brief summarizes the pattern across all 38 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211446The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief