Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 316 decisions within 5 km, 2 exact-site or onsite candidate records, and 11 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
11 structured nearby appeal records.
11 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
RETAIN GARAGE
RETAIN THE ELEVATIONAL CHANGES MADE TO EXISTING DWELLING HOUSE, RETAIN THE TIMBER SHED AND TO RETAIN THE DWELLING HOUSE AND SHED ALL WITHIN REVISED SITE BOUNDARIES
CONSTRUCT A SOLID FLOOR SHEEP HOUSE WITH PENNING AND ASSOCIATED EFFLUENT TANK AND ANCILLARY CONCRETE FARMYARD ON THE LAND
RETAIN DWELLING HOUSE AS CONSTRUCTED WITHIN REVISED SITE BOUNDARIES AND PERMISSION TO (A) RENOVATE EXISTING SINGLE STOREY DWELLING, (B) CONVERT EXISTING SHED TO HABITABLE ACCOMMODATION, (C) CONSTRUCT AN EXTENSION TO AMALGAMATE BOTH HOUSE AND SHED TOGETHER, (D) ALLOW FOR ELEVATIONAL CHANGES, (E) DECOMMISSION EXISTING FOUL TREATMENT SYSTEM AND INSTALL NEW SEPTIC TANK WITH PERCOLATION AREA, (F) CLOSE UP EXISTING SITE ENTRANCE AND CREATE A NEW ENTRANCE TO PUBLIC ROAD, (G) OPEN UP EXISTING CLOSED ACCESS FOR ENTRANCE TO PUBLIC ROAD ON THE SUNHILL ROAD AND (H) ALL ANCILLARY WORKS
CONSTRUCT A NEW EASY FEED SLATTED UNIT ATTACHED TO EXISTING FARM BUILDING. THE PROPOSED STRUCTURE TO INCORPORATE CUBICLES AND ASSOCIATED UNDERGROUND SLURRY STORAGE TANK WITH 2 EXTERNAL AGITATION POINTS. THE ABOVE TO INCLUDE ALL ASSOCIATED ANCILLARY SITE WORKS
CARRY OUR RENOVATIONS TO EXISITING DWELLING INCLUDING ALTERATION AND RAISING OF ROOF PITCH TO INCORPORATE FIRST FLOOR WINDOWS, ALONG WITH CONSTRUCTION OF AN EXTENSION TO THE REAR OF THE EXISTING DWELLING INCLUDING THE DECOMMISSION OF THE EXISTING SEPTTIC TANK AND THE INSTALLATION OF A NEW SEPTIC TANK AND PERCOLATION AREA
The brief summarizes the pattern across all 316 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211457The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief