New dormer dwelling, garage, septic tank with effluent tratment system, site entrance and associated site works on our lands
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Priesttown Demesne , Drangan , Co. Tipperary
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
4% of nearby decided applications were refused. The preview found 114 nearby planning records within 5 km where a location match is available.
- Matched source
- 211850
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Construction of a single storey dwelling with waste water treatment unit and raised bed percolation area, site entrance and all associated site works
The construction of a milking parlour building incorporating: dairy, plant, storage, meal bin, rain water storage tank, milk silo, holding yard with crush/drafting yard, underground effluent tank with flow channel and all associated site works
Construction of a new 14 unit milking parlour complete with dairy, electrical room and meal bin and all associated site works
Single storey entrance porch to front of dwelling house
The construction of a 21 metre high free standing communications structure (total height with antennas 21.1 metres) carrying telecommunications equipment, together with associated exchange cabinets, fencing, access gate, hedgerow removal, hardstand entrance and all associated site development works. The development will form part of Eircom Ltd. existing telecommunications and broadband network
The brief summarizes the pattern across all 114 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 211850The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief