Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 850 decisions within 5 km, 2 exact-site or onsite candidate records, and 60 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
60 structured nearby appeal records.
60 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Retention of existing first floor for use as store and offices ancillary to retail of bulky goods and electrical goods, retention of alteration to front elevation comprising addition of roller shutter door to Unit 3 and retention of internal access at ground floor and first floor between Units 2 & 3. PERMISSION is also sought for the addition of first floor for use as store and offices ancillary to retail of bulky goods and electrical goods in Units 1 & 2, alteration to front elevation of Unit 1 comprising addition of roller shutter door, alteration to rear of Unit 1 comprising addition of fire escape door at ground floor level and provision of internal access at ground floor and first floor between Units 1 & 2
1. To carry out a change of use from retail to gymnasium facility. 2. Installation of a first floor mezzanine level and all associated internal modification works
A coffee kiosk and ancillary works.
A) to construct an extension to the southern side of their existing light industrial building for use as a Store/Warehouse, b) to install 1,727m2 of roof mounted solar PV panels to both sides of the pitched roof of the proposed extension and on part of the existing buildings pitched roof on the south facing side, proposed handrail surrounding all PV solar panel areas and c) change of use of the existing building from Light Industrial to Storage/Warehousing and all associated ancillary works at existing premises
For alteration of the existing access/entrance at the public road to provide improved sightlines by setting back portion of the boundary wall and replacement of the existing fence with matching boundary wall and replace with railing together with associated site works
Development which will consist of: the change of use of the property from commercial/light industrial unit to a warehouse with ancillary trade counters (for the sale of building related products principally to trade). Internal works include: removal of part of first floor to allow for double height warehouse; inclusion of trade counters and staff facilities. Proposed external works include: three signage zones (two at the front and one at the rear); replacement of existing doors around the unit; mark out 4 parking spaces including one mobility impaired space; inclusion of mechanical plant; and security bollards at various access points. All other works associated with and to complete the development
The brief summarizes the pattern across all 850 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21265The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief