The development will consist of PERMISSION to renovate and extend the existing cottage and install a proprietary waste treatment system and polishing filter together with ancillary site works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Ballygastell , Lisdoonvarna , Co Clare
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
5% of nearby decided applications were refused. The preview found 99 nearby planning records within 5 km where a location match is available.
- Matched source
- 2131
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
For development at Toovahera Church (which is a Protected Structure Number 175), which will consist of creating an area for use as a church carpark with a new entrance from the pubic road to the carpark, altering the existing roadside wall of the church, and all other associated site and ancillary works
To build a new house, garage, install a waste water treatment system and all associated and ancillary site works
To develop as follows: Construct a standalone Art Room structure
For permission/RETENTION for development which consists of a) the RETENTION of alterations to dwelling house as granted under planning ref. P04-2643, b) RETENTION of a domestic garage and c) RETENTION of the septic tank serving the dwelling with PERMISSION to upgrade the percolation area together with ancillary site works
To construct a dwelling with on-site wastewater treatment, garage and new site entrance
The brief summarizes the pattern across all 99 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2131The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Site-specific risk summary
Included in site brief
Source evidence
Included in site brief
Comparable decision set
Included in site brief