Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 61 decisions within 5 km, 1 exact-site or onsite candidate record, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A 10 YEAR PERMISSION FOR THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 25MW COMPRISING OF CA.55,000 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 10 NO. POWER HUBS (CA. 15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 7 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, LANDSCAPING, A NEW SITE ENTRANCE AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WIL BE CA. 31.1HA. AN NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS.
CONSTRUCTION OF A NEW ONE-STOREY, THREE BEDROOM DWELLING HOUSE, NEW VEHICULAR ENTRANCE, NEW EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
A SINGLE STOREY EXTENSION TO THE REAR (SOUTH) OF EXISTING SEMI DETACHED DWELLING COMPRISING OF A KITCHEN/DINING ROOM, UTILITY ROOM, HOT PRESS, BATHROOM AND TWO BEDROOMS TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
Construction of a new dwelling house, detached garage, new vehicular entrance, new driveway, borewell, waste water treatment system, storm water soakaways, and all associated site works
The brief summarizes the pattern across all 61 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21622The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief