Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 162 decisions within 5 km, 1 exact-site or onsite candidate record, and 2 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Laois County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Laois County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Laois County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
2 structured nearby appeal records.
2 matchedNo current-dated citation is loaded for Laois County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construct an extension to the rear of our existing dwelling along with all ancillary services
Develop an agricultural shed to include machinery storage.
Construct a new dwelling house and domestic garage, septic tank and percolation area, new site entrance, ancillary site services and all associated site works
Construct dwelling house, domestic garage, sewage treatment system with soil polishing filter, bored well and entrance
Construct a new entrance and new boundary wall to existing car park along with associated site works
Permission sought for alterations to existing gate entrance to (former rear) entrance gateway to Capard House, Capard Demesne / Skerry Rosenallis. The propose development relates to an element of Capard house which is a protected structure (RPS Ref: 434_A_B_C). The proposed works consists of (a) carefully dismantle the existing gates and ancillary heritage ironwork; (b) carefully dismantle the gateway surround masonry walls (the dressed stonework, rubble stones in the fabric of the existing walls, etc. - for later reuse in the walls as set back); (c) alter the line of the gateway and surrouning walls so as to improve sightlines by setting that line back to new gateway/surround wall line as shown on the drawing; (d) (re) construct the gateway and surround walls to include a wider gateway opening; a pedestrian gateway, appropriate new dressed stone piers and capping; (e) have the existing gateway ironwork extended by a heritage blacksmith so as to provide for a wider gateway opening; (f) provide a new pedestrian gate (by heritage blacksmith) to match the pattern of the existing gates; (g) surface water drainage to existing internal surface water disposal system, (h) completion of hard and soft landscaping as shown on the drawings (i) fitting of automatic electro-mechanical gate operation system (j) related ancillary works
The brief summarizes the pattern across all 162 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21871The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief