Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 267 decisions within 5 km, 2 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission consisting of the change of use and alteration of an existing dwelling to provide a single storey office/workspace building incorporating waiting area, CEO office general office, meeting room, staff canteen, accessible WC and storage areas. External works including new car parking area, new access to existing adjacent car park, pedestrian pathways and ramps, cycle stands, alterations to existing access, associated landscape and connections to all existing services
Permission to construct a new part two storey style dwelling house and domestic garage, new entrance laneway onto public road L3500, new connection to public mains and public sewer, together with all associated ancillary site development works
Permission for a development which will consist of a) decommissioning and removal of existing wastewater treatment plant and percolation area and b) installation of new treatment plant comprising a cast in-situ concrete compartmented tank structure with four biozones, balancing tank, sludge storage tank, final settlement tank, control room and aeration blower on a cast in-situ concrete plinth with fenced enclosure, c) 1670m2 reed and willow bed tertiary treatment and polishing system d) new discharge to existing surface water course, together with e) associated external works including new access to existing adjacent service yard, connections to all existing services
Planning permission for a development which will consist of demolition of an attached store and existing boundary wall and piers. Also included is the construction of a single storey extension and pergola, elevational amendments, infill boundary wall to block up one of two site entrances, landscaping and all associated site works. Significant Further Information received relates to submitted Water protection checklist, Soil assessment report, and Revised site layout plan
1.The construction of a new vehicular in out access from the public road including pedestrian access and drop-off and pick up facilities. 2. The alteration of the existing site layout to provide additional car parking spaces.3. The provision of new running track to perimeter to existing football field.4. The provision of additional hard surfaced play area and all associated site works
Permission for a development consisting of elevational changes and relocation of dwelling on site as per previously granted planning permission ref. no's. 07/2431, 13/9023 and all associated site development works
The brief summarizes the pattern across all 267 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22358The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief