Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 545 decisions within 5 km, 1 exact-site or onsite candidate record, and 44 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
44 structured nearby appeal records.
44 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(a) a new farmyard entrance in place of existing roadside entrance, (b) construction of an agricultural building to include milking parlour, dairy, ancillary rooms, waiting yard, underground slatted soiled water storage tank and livestock handling and drafting facilities and installation of solar panels on roof, (c) erection of a meal bin and water storage tank and all associated siteworks
The construction of a dwelling house, storage shed, entrance, driveway, treatment system and all associated site development works
To retain indefinitely the as-constructed agricultural shed and all associated site development works
The construction of an agricultural storage shed, entrance, yard and all associated site development works
The filling of the existing depression in the ground and reinstate ground to new levels including new access and all associated site development works
The construction of an extension to the side of the existing dwelling house and for the upgrade of the existing effluent treatment system with all other associated site works
The brief summarizes the pattern across all 545 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2260280The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief