Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 203 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For the construction of a community walkway adjacent to the River Clare from the existing public footpath adjacent to the bridge (N17 crossing of River Clare) in Milltown Village to the grounds of Milltown GAA Club and all ancillary works
Of a) a Maintenance Shed, b) For the erection of 8 No. 20m high Pitch floodlighting Columns to the Main Pitch and c) For the erection of 8 No. 18m high Pitch floodlighting Columns to the Second Pitch and all associated works. Gross floor space of work to be retained: 32 sqm
For the development consisting of the construction of a new single storey extension to the side and rear of existing dwelling with associated site works
To carry out alterations to the existing community care centre which will involve the creation of an apartment in part of the community care centre, full planning permission also sought for the construction of a new dwelling house and all ancillary site works. Gross floor space of proposed works: 115 sqm (H)
Of the existing bar and restaurant areas as constructed to include an additional 48sqm floor area located to the rear incorporating toilets, plant room and extended function room, with permission to complete a revised and improved car parking area externally with traffic management system, together with all ancillary existing site works and services. Gross floor space of work to be retained 48.0sqm.
For change of use of shop unit to a one bedroom apartment at 48 Millbrook. Gross floor space of proposed works: 52.5 sqm. Gross floor space of work to be retained: 52.5 sqm.
The brief summarizes the pattern across all 203 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2260292The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief