Free preview / €29 incl. VAT site brief

Site planning risk brief

Fix the brief to an Eircode, a dropped pin or a drawn site boundary. PlanIntel then checks the planning register, available spatial layers, appeals and current indexed policy evidence.
See sample PDF

Define the land to check

Monaraha , Cahir , Co. Tipperary.Opens secure checkout for the €29 incl. VAT site risk brief. Promotion codes can be entered at checkout.
€29 incl. VAT once-off PDF, no account required
Refund requests are reviewed under the published refund policy
Derived from public planning records and linked source documents
PlanIntelSite risk brief preview

Site planning risk brief

Monaraha , Cahir , Co. Tipperary.

One-off house / within 5 km where a location match is available

Preview

Local planning pattern

5% of nearby decided applications were refused. The site check found 261 decisions within 5 km, 3 exact-site or onsite candidate records, and 15 structured appeals.

Matched source
2260376
Project type
One-off house
Coverage
5 km radius

What this site brief can substantiate today

Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.

Applications tied to the site

Partial coverage

3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.

3 matched

Zoning and settlement

Not yet covered

Current indexed zoning and settlement layers are intersected with the selected site where coverage exists.

Rural-housing policy

Not yet covered

Current section-and-page citations have not yet been loaded for this authority.

Flood, heritage, ecology and archaeology

Not yet covered

Each layer reports its own coverage; missing coverage never appears as a clean result.

Access, road and wastewater prompts

Partial coverage

0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.

Structured appeal history

Confirmed coverage

15 structured nearby appeal records.

15 matched

Current policy citations

Not yet covered

Historic extracted references are not presented as current policy; verified citations are still being loaded.

261Nearby applications
3Site-linked candidates
5%Nearby refused
15Structured appeals

Top refusal reasons nearby

No reasons on record yet

More refusal reasons are being processed from public planning records.

Nearest planning decisions

2260376

Amendment to a permitted Solar Farm (Tipperary County Council Reg. Refs. 16/600565, 20/46, 21/446 and 22/152) at Monaraha, Cahir, County Tipperary. The development will consist of the provision of 2 No. weather stations, provision of additional CCTV and associated electrical ducting and amendment of Condition No. 2 of the permission (Tipperary County Council Reg. Ref. 20/46) to provide for the substation compound and associated infrastructure as a permanent development which is not required to be removed from site after 35 years from the date of commencement

Granted0.0 km08 September 2022
22152

To amend the solar farm permitted on the site under Tipperary County Council Reg. Ref. 20/46 and consists of a revised solar PV panel arrangement resulting in an increase in the overall panel footprint extent; a reconfigured internal – access route network resulting in a decrease to the overall network length; the reduction in the number of transformer stations from 16 No. to 5 No. and the provision of string inverters to the rear of panel arrays. It is also proposed to reduce the previously permitted maximum export capacity to 19 MW.

Granted0.0 km13 April 2022
2046

Amend previously approved planning consent 16/600565 for a grant of a ten-year planning permission for a solar farm, the development will consist of an increase in the previously approved mega wattage output; amendments to the previously approved site layout including a reduced number of overall panel modules; additional and revised battery storage units; additional and revised designs for inverters and field transformers; the inclusion of switchgear substations; revisions to the panel elevations to include bi-facial panels; revisions to the panel dimensions to include an increased panel (and leg) max height of no more than 2.5m; revisions to the individual panel width and length; and a reduction in the spacing between the panel rows. Permission is also sought to extend the operational lifespan of the solar farm from 30 years to 35 years from commissioning to the grid

Granted0.0 km13 March 2020
21446

Amend previously approved planning consents (Tipperary County Council Ref 16/600565 and 20/46) for a solar farm. The development will consist of a modification to the previously approved on-site substation to allow for a 38kV electrical substation configuration within the solar farm. In order to facilitate the construction of the 38kV substation design, the previously approved 3 no. battery storage units and approximately 240m of previously approved PV panel area will be replaced. The 38kV substation will include the construction of a control building, an ESB and IPP compound with associated infrastructure including a 38kV busbar, 38kV transformer, 38kV electrical equipment, lightning mast, and all associated ancillary infrastructure required for the project

Granted0.4 km25 August 2021
2561193

The demolition of existing detached garage and construction of a new larger single-storey detached garage & ancillary spaces to the side of existing dwelling, free-standing carport, alterations to existing dwelling entrance area and elevations generally, single storey extension to the rear of existing dwelling, connection to existing on-site foul drainage system, and all associated site development works

Granted0.7 km22 January 2026
2560240

Construction of an extension to the side and rear of existing dwelling house with alterations to the internal layout and existing elevations, all with associated site works

Granted1.0 km19 May 2025

The brief summarizes the pattern across all 261 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.

The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.

Exact site history and boundary checks

Site brief

Policy and mapped constraints

Site brief

Appeals and comparable decisions

Site brief

Deterministic risk prompts

Site brief
Ready to get the site risk brief?€29 incl. VAT once-off PDF, no account required