Amendments to house design as constructed from that previously granted (Planning Ref 06/51/0546) to incorporate revised floor plans, amendments to building elevations and revised site layout including revised location of detached garage and revised position of septic tank and percolation area together with all incidental site works
Site planning risk brief
Search a place or planning reference, choose the development type, then preview the report before getting the full site brief.Site planning risk brief
Scragg , Carrigatoher , Nenagh
One-off house / within 5 km where a location match is available
Executive snapshot
Local planning pattern
3% of nearby decided applications were refused. The preview found 142 nearby planning records within 5 km where a location match is available.
- Matched source
- 2260443
- Project type
- One-off house
- Coverage
- 5 km radius
Open preview
Top refusal reasons nearby
No reasons on record yet
Open preview
Nearest planning decisions
Change of design of proposed extension to existing dwelling granted permission under planning reference 17601023
The construction of a new one and a half storey extension, for alterations to the fenestration of the existing dwelling to include a new bay window and rooflights, and for the decommissioning of the existing septic tank and replacement with a new waste water treatment system, septic tank and percolation area and all associated site works
The construction of cubicles shed with slatted tanks and all associated site works
The construction of a dwelling house, garage, entrance, waste water treatment plant & all other ancillary site works
The construction of a cubicles shed extension with underground effluent tank and all associated site works
The brief summarizes the pattern across all 142 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €49 incl. VAT.
Source match
Matched from public planning record 2260443The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.