Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 53 decisions within 5 km, 4 exact-site or onsite candidate records, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
An uncompleted agricultural store and permission to complete works to the store and all associated site works. Retention permission is also sought to retain lean-to roof with open parking area under at the dwelling,
A new agricultural entrance from the public roadway and close up an existing entrance for road safety reasons
To renovate and extend existing dwelling house, construct new storage shed, upgrade waste water treatment system along with all ancillary site works
Upgrade of existing entrance from public roadway onto forestry lands, to comprise the provision of splayed access, clear visibility sightlines, associated setting back of adjacent roadside boundaries, provision of associated surface water drainage, fences, finished hardcored structure to access area and all associated siteworks
Construction of a detached two-storey dwelling house, detached garage, entrance, boundary walls, septic tank, percolation area, including and all ancillary site works and access to public road through new right of way
An extension to the rear of house
The brief summarizes the pattern across all 53 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 2260457The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief