Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 101 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A temporary Meteorological Mast and associated site works that will operate for a further 3 years, it will retain its finished height not exceeding 80m above existing ground level consisting of a lattice tubular frame, guy wires and ancillary equipment
An amendment to the planning application previously granted permission under planning reference 20/972. The previously consented planning application included the construction of 9 turbines with maximum overall ground to blade tip height of up to 150 metres, associated foundations and hardstand areas; new site entrances, upgrade of existing site entrances; new on-site 38KV substation and all ancillary site works. The proposed amendments to the previously consented application comprise: (1) Increase the tip height of the turbines from 150 to 156.5 metres and increase the rotor diameter from 133 to 136 metres (3) Reconfiguration of a number of the consented hardstand layouts and associated changes to internal access roads (4) Minor Adjustments to the red line boundary (5) Provision of LiDAR (This application is accompanied by a NIS)
A ten year planning permission for a renewable energy development with a 40-year operational life (from the date of commissioning of the renewable energy development). The entirety of the development constitutes the provision of a 9-turbine wind farm and all associated works on lands in both Counties Tipperary and Kilkenny. This development comprises part of an overall development for which planning permission is also sought for a 38kV substation in the townland of Killeen, Co. Kilkenny. A separate planning application will be made for an underground grid connection to Tipperary County Council and to Kilkenny County Council. The proposed development will constitute the provision of the following: • Construction of up to 9 turbines each with a maximum overall ground to blade tip height of up to 150 metres and associated foundations and hardstand areas; • Construction of new site entrances and upgrade of existing site entrances; • Internal wind farm underground power and communications cabling; • Upgrade of existing access tracks and provision of new site access roads; • Removal of existing Meteorological Masts and construction of 1 new Meteorological Mast for monitoring wind speeds with a maximum height of up to 85 metres; • Site drainage network • Construction of a new temporary site compound for use during construction; • Two Borrow Pits • Construction of a new on-site 38kV substation The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement
A) an increase to the footprint of the substation compound of 381.6m2, b) an increase to the footprint of the substation building of 51.5m2, c) amendments to the layout of the offices and welfare facilities within the substation building, d) addition of 2 no. containers sized 6m by 2.43m by 2.59m in height for storage of parts and equipment during the operational phase, e) addition of 2 no. parking spaces and an extension of the access road, f) associated relocation of the permitted fence, g) amendments to the drainage design to accommodate changes to the layout, h) minor amendments to the red line of the permitted development to accommodate the above and i) addition of new joint bay
A dwelling, domestic garage, entrance, bore well, install waste water treatment system including associated site works
To demolish existing farm buildings on site, build a 1.5 storey dwelling, domestic garage, entrance, bore well, install waste water treatment system including associated site works
The brief summarizes the pattern across all 101 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2260696The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief