Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 226 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
WORKS INVOLVING THE PREPARATION AND OPERATION OF A SANDPIT TO REMOVE A DISCRETE HILL (CA.3.137HA) WITHIN AN AGRICULTURAL FIELD. THE SITE WILL BE ACCESSED FROM THE EXISTING FIELD ENTRANCE OFF THE R436. THE CONSTRUCTION WORKS WILL INCLUDE THE WIDENING OF THE EXISTING ENTRANCE, INSTALLATION OF A WHEEL WASH, TEMPORARY PORTACABIN (CONTAINING WELFARE FACILITIES AND AN OFFICE BUILDING), INTERNAL ACCESS TRACK, FENCING AND BOUNDARY LANDSCAPING, INCLUDING THE TEMPORARY INSTALLATION OF EMBANKMENTS/BERMS FROM TOPSOIL REMOVED PRIOR TO WORKS. THE OPERATIONAL PHASE WILL RESULT IN THE EXTRACTION OF CA.142,646M3 OF SAND AND GRAVELS OVER A PERIOD OF 6-10 YEARS. WHEN EXTRACTION ACTIVITIES HAVE CEASED THE SITE WILL BE REINSTATED AS AGRICULTURAL LAND -REUSING THE ORIGINAL TOPSOIL
20/555 FOR A PROPOSED NEW TWO STOREY DWELLING, GARAGE, DRIVEWAY, NEW CONNECTION TO LOCAL AUTHORITY PUBLIC WATER SUPPLY, NEW VEHICULAR ENTRANCE, WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA, STORMWATER SOAKAWAYS AND ALL ASSOCIATED SITE WORKS & LANDSCAPING
A PROPOSED NEW TWO STOREY DWELLING, GARAGE, DRIVEWAY, NEW CONNECTION TO LOCAL AUTHORITY PUBLIC WATER SUPPLY, NEW VEHICULAR ENTRANCE, WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA, STORMWATER SOAKAWAYS AND ALL ASSOCIATED SITE WORKS & LANDSCAPING
CONSTRUCTION OF A SIDE AND REAR EXTENSION TO EXISTING DWELLING HOUSE, TO CLOSE EXISTING SITE ENTRANCE AND CONSTRUCT NEW SITE ENTRANCE, DECOMMISSION EXISTING SEPTIC TANK AND INSTALL NEW SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
1 NO. PART SINGLE, PART TWO-STOREY DWELLING HOUSE; DOUBLE BAY GARAGE, SEPARATE WORKSHOP, SEPTIC TANK WASTEWATER TREATMENT SYSTEM AND ANCILLARY PERCOLATION AREA; WATER SOURCE WELL, SURFACE WATER SOAKAWAYS, DRIVEWAYS, LANDSCAPING AND GENERAL SITE WORKS; NEW PEDESTRIAN AND VEHICULAR SITE ENTRANCE AND ASSOCIATED CONNECTIONS TO PUBLIC UTILITIES
EXISTING EXTENSION TO SIDE OF DWELLING AS CONSTRUCTED ON SITE AND ALL ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 226 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2277The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief